Bus Partners
Home Services New Floor Installation Lighting Schedule A Free Estimate
HomeServicesNew Floor InstallationLightingSchedule A Free Estimate
Bus Partners
For all your bus needs.
 We start off by numbering all the seats, so they can be reinstalled in the same order. This prevents unneeded holes being drilled into the metal flooring.
 We start off by numbering all the seats, so they can be reinstalled in the same order. This prevents unneeded holes being drilled into the metal flooring.

We start off by numbering all the seats, so they can be reinstalled in the same order. This prevents unneeded holes being drilled into the metal flooring.

 We then remove all the seating, flooring, plastic covers, and side panels. One of the bus partner differences is when we replace the floor, we do it all the way up to the drivers petals.

We then remove all the seating, flooring, plastic covers, and side panels. One of the bus partner differences is when we replace the floor, we do it all the way up to the drivers petals.

Floors - During Restoration

Floors - During Restoration

Once the uninstall is complete we dry the metal flooring, sand, and clean. Any metal work that needs to be done, will happen in this stage.

 Once the floors are repaired and sanded, we roll on two thick coats of rustoleum to prevent further floor deterioration.

Once the floors are repaired and sanded, we roll on two thick coats of rustoleum to prevent further floor deterioration.

 All plywood is replaced with marine grade board. All cuts are made on-site and dry fitted. From the factory the boards are pieced together around the wheel wells. We use one board and cut the wheel wells to fit - increasing stability.

All plywood is replaced with marine grade board. All cuts are made on-site and dry fitted. From the factory the boards are pieced together around the wheel wells. We use one board and cut the wheel wells to fit - increasing stability.

 We install new rubber, the freshly painted duct work, and new trim through the entire bus.

We install new rubber, the freshly painted duct work, and new trim through the entire bus.

 All seats are cleaned, frames are painted, and reinstalled using new bolts. If any seats need to be recovered this is the perfect opportunity to do so.   We then clean the entire bus at this point top to bottom.

All seats are cleaned, frames are painted, and reinstalled using new bolts. If any seats need to be recovered this is the perfect opportunity to do so.

We then clean the entire bus at this point top to bottom.

1 2 3 4 5 6 7
Previous Next
 We start off by numbering all the seats, so they can be reinstalled in the same order. This prevents unneeded holes being drilled into the metal flooring.
 We then remove all the seating, flooring, plastic covers, and side panels. One of the bus partner differences is when we replace the floor, we do it all the way up to the drivers petals.
Floors - During Restoration
 Once the floors are repaired and sanded, we roll on two thick coats of rustoleum to prevent further floor deterioration.
 All plywood is replaced with marine grade board. All cuts are made on-site and dry fitted. From the factory the boards are pieced together around the wheel wells. We use one board and cut the wheel wells to fit - increasing stability.
 We install new rubber, the freshly painted duct work, and new trim through the entire bus.
 All seats are cleaned, frames are painted, and reinstalled using new bolts. If any seats need to be recovered this is the perfect opportunity to do so.   We then clean the entire bus at this point top to bottom.
Bus Partners, LLC
6010 Middleboro Road,
Morrow, OH, 45152,
United States
513.748.5355 jr@buspartnersllc.com
Hours
Mon 8am - 6pm
Tue 8am - 6pm
Wed 8am - 6pm
Thu 8am - 6pm
Fri 8am - 6pm
Sat 8am - 6pm
Sun 8am - 6pm

Schedule A Free Estimate

Start Now
InstagramFacebook